[1] Lund R. Remanufacturing: an American resource[C]//Proceedings of the Fifth International Congress Environmentally Conscious Design and Manufacturing. June, 1998, 16.[2]范体军, 陈荣秋. 绿色再制造运作模式分析[J]. 管理学报, 2005,2(5):465-567. [3]范体军,常香云,陈荣秋. 大型废旧产品回收网络的数学模型与算法研究[J]. 管理科学学报,2009, 12(4):82-90. [4]Gupta S M, Taleb K N. Scheduling disassembly[J]. International Journal of Production Research, 1994, 32(8): 1857-1866.[5]Richter K, Weber J. The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost[J]. International Journal of Production Economics, 2001, 71: 447-456.[6]Kleber R, Minner S, Kiesmuller G. A continuous time inventory model for a product recovery system with multiple options[J]. International Journal of Production Economics, 2002, 79(2): 121-141.[7]Teunter R H, Bayindir Z, Heuvel V D. Dynamic lot sizing with product returns and remanufacturing[J]. International Journal of Production Research, 2006, 44(20): 4377-4400.[8]Vaidyanathan J. Production planning for closed-loop supply chains with product recovery and reuse: An analytical approach[J]. International Journal of Production Research, 2006,44(5):981-998.[9]Chen M, Abrishami P. A mathematical model for production planning in hybrid manufacturing-remanufacturing systems[J]. The International Journal of Advanced Manufacturing Technology, 2014, 71(5-8): 1187-1196.[10]魏祥, 刘清涛, 刘晓婷,等. 考虑价差和再制造率的制造/再制造混合系统生产批量研究 [J]. 组合机床与自动化加工技术, 2014 (12). [11]楼高翔, 周虹, 范体军. 考虑外包和生产能力约束的制造/再制造混合批量决策[J]. 系统管理学报, 2011, 20(5): 549-555. [12]景熠, 王旭, 李文川,等. 面向汽车发动机的制造/再制造混合批量生产计划[J]. 计算机集成制造系统, 2013, 19(4): 774-781. [13]Jing Y, Wang X, Li W, et al. Optimization for lot sizing production planning with product remanufacturing and demand substitution[J]. Zhongguo Jixie Gongcheng:China Mechanical Engineering, 2012, 23(18): 2176-2181.[14]Jing Y, Wang X, Li W C, et al. Hybrid lot sizing production planning of manufacturing and remanufacturing to automobile engine[J]. Computer Integrated Manufacturing Systems, 2013, 19(4): 774-781.[15]Wen H, Liu M, Liu C, et al. Remanufacturing production planning with compensation function approximation method[J]. Applied Mathematics and Computation, 2015, 256: 742-753.[16]Geraldo F, Jayashankar M S. Managing new and differentiated remanufactured products [J]. European Journal of Operational Research, 2010, (203):370-379.[17]Shi J M, Zhang G Q, Sha J C. Optimal production planning for a multi-product closed loop system with uncertain demand and return [J]. Computers & Operations Research, 2011, 38: 641-650.[18]谢家平,王爽. 偏好市场下制造/再制造系统最优生产决策[J]. 管理科学学报, 2011,14(3):24-33. [19]Savaskan R C, Bhattacharya S, Van Wassenhove L N. Closed-loop supply chain models with product remanufacturing[J]. Management Science,2004,50(2):239-252.[20]Chu Feng,Chu Chengbin.Polynomial algorithms for single-itern lot-sizing models with bounded inventory and backlogging or outsourcing[J].IEEE transactions on Automation Science and Engineering,2007,4(2):233-251.[21]范体军,楼高翔,王晨岚,等. 基于绿色再制造的废旧产品回收外包决策分析[J]. 管理科学学报, 2011,14(8): 8-16. [22] De Giovanni P, Zaccour G. A two-period game of a closed-loop supply chain[J]. European Journal of Operational Research, 2014, 232(1): 22-40.[23] Lu Q, Goh M, Garg M, et al. Remanufacturing in Asia: Location choice and outsourcing[J]. The International Journal of Logistics Management, 2014, 25(1): 20-34.[24]笪梁玲, 迟琳娜, 谢家平. 汽车逆向物流的回收渠道策略[J].当代经济管理,2015, 37(1): 33-39. |