具备“平行结构”的局域性资源受限项目调度问题的新模型
魏汉英, 原梦迪, 苏志雄
New Modelling for a Local Resource-Constrained Project Scheduling Problem with “Parallel Structure”
WEI Hanying, YUAN Mengdi, SU Zhixiong
系统管理学报 . 2025, (2): 428 -445 .  DOI: 10.3969/j.issn.2097-4558.2025.02.011