[[1]]张国兴, 郭菊娥,刘东霖. 建设时间和投资成本不对称的双寡头期权博弈模型[J]. 管理科学, 2008,21(4):75-81.[[1]]刘士新, 王梦光, 唐加福. 求解项目调度中资源水平问题的近似算法[J]. 系统工程学报, 2002,17(4):296-302.[[1]] Ahuja H N, Construction performance control by network [M]. New York: John Wiley & Sons, 1976.[[1]] Younis M A, Saad B. Optimal resource leveling of multi-resource projects [J]. Computers and Industrial Engineering,1996,31(2):1-4.[[1]] Bandelloni M, Tucci M, Rinaldi R. Optimal resource leveling using non-serial dynamic programming [J]. European Journal of Operational Research, 1994, 78 (2) : 162-177.[[1]] Neumann K, Zimmermann J. Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints[J]. European Journal of Operations Research,2000(127):425-443.[[1]] Rieck, J., Zimmermann, J., Gather, T.. Mixed-integer linear programming for resource leveling problems[J]. European Journal of Operational Research,2012,221(1):27-37.[[1]] Tang Y J, Liu R K, Sun Q X . Schedule control model for linear projects based on linear scheduling method and constraint programming[J]. Automation in Construction,2014,(37):22-37.[[1]] Gather T, Zimmermann J, Bartels J H. Exact methods for the resource leveling problem [J]. Journal of Scheduling,2011,14(6):557-569.[[1]] Pritsker A A B, Watters L J, Wolfe P M. Multi-project scheduling with limited resources: a zero-one programming approach [J]. Management Science,1969(16):93-108.[[1]] Easa S M. Resource leveling in construction by optimization [J]. Journal of Construction Engineering and Management, 1989(115):302-316.[[1]] Hariga M, El-Sayegh S M. Cost optimization model for the multi-resource leveling problem with allowed activity splitting[J]. Journal of Construction Engineering and Management,2011, 137 (1) :56–64.[[1]]庞南生,纪昌明.广义时序下活动多模式与离散型资源均衡优化[J].系统工程学报, 2011,26(4):538-545.[[1]]满庆鹏, 王要武, 李晓东. 基于Petri网的施工进度建模及优化方法[J].系统管理学报, 2009,18(2):193-198.[[1]]郭云涛, 白思俊, 徐济超等. 基于粒子群算法的资源均衡[J].系统工程, 2008,26(4):99-103.[[1]]张静文,单绘芳. 可更新资源受限的工期-费用权衡问题及粒子群算法[J].系统管理学报,2012,21(2):186-200. [[1]] Herroelen W S, van Dommelen P,Demeulemeester E L. Project Network Models with Discounted Cash Flows: A Guided Tour through Recent Developments [J]. European Journal of Operational Research, 1997,(100):97-121. |