[1] Murthy D N P, Pongpech J. Maintenance of leased equipment[M]. Complex System Maintenance Handbook. Springer London, 2008.[2] 谢文明, 江志斌, 汪益新, 等. 基于服务型制造的设备维护外包合同设计[J]. 系统管理学报, 2013, 22(3): 289-294.[3] 马卫民, 徐博, 黄卉. 有限使用寿命情形下局内设备的赁购决策[J]. 系统管理学报, 2013, 22(4): 513-517.[4] Barlow R, Hunter L. Optimum preventive maintenance policies[J]. Operations Research, 1960, 8(1): 90-100.[5] Wang H. A survey of maintenance policies of deteriorating systems[J]. European journal of operational research, 2002, 139(3): 469-489.[6] Pham H, Wang H. Imperfect maintenance[J]. European journal of operational research, 1996, 94(3): 425-438.[7] Jaturonnatee J, Murthy D N P, Boondiskulchok R. Optimal preventive maintenance of leased equipment with corrective minimal repairs[J]. European Journal of Operational Research, 2006, 174(1): 201-215.[8] Yeh R H, Kao K C, Chang W L. Optimal preventive maintenance policy for leased equipment using failure rate reduction[J]. Computers & Industrial Engineering, 2009, 57(1): 304-309.[9] Yeh R H, Chang W L. Optimal threshold value of failure-rate for leased products with preventive maintenance actions[J]. Mathematical and Computer Modelling, 2007, 46(5): 730-737.[10] Yeh R H, Chang W L, Lo H C. Optimal length of lease period and maintenance policy for leased equipment with a control-limit on age[J]. Mathematical and Computer modelling, 2011, 54(9): 2014-2019.[11] Pongpech J, Murthy D N P. Optimal periodic preventive maintenance policy for leased equipment[J]. Reliability Engineering & System Safety, 2006, 91(7): 772-777.[12] Yeh R H, Chen C K. Periodical preventive-maintenance contract for a leased facility with Weibull life-time[J]. Quality and Quantity, 2006, 40(2): 303-313.[13] Cheng C Y, Zhao X F, Chen M, et al. A Failure-rate-reduction periodic preventive maintenance model with delayed initial time in a finite time period[J]. Quality Techonlogy & Quantitative Management, 2014, 11(3): 245-254.[14] 金琳, 王燕, 周晓军. 基于虚拟年龄的租赁设备预防性维护策略研究[J]. 工业工程与管理, 2013, 18(6): 68-72.[15] 金琳, 黄开敏, 周晓军. 租赁设备的多阶段预防性维护策略及优化[J]. 计算机集成制造系统, 2013, 19(12): 2947-2953.[16] Zhou X, Li Y, Xi L, et al. Multi-phase preventive maintenance policy for leased equipment[J]. International Journal of Production Research, 2014,53(15): 4528-4537.[17] Shafiee M, Chukova S. Maintenance models in warranty: A literature review[J]. European Journal of Operational Research, 2013, 229(3): 561-572.[18] 王扬, 徐寅峰, 董玉成, 等. 考虑二手货市场的在线租赁决策与竞争[J]. 系统管理学报, 2011, 20(4): 428-432.[19] Chattopadhyay G N, Murthy D N P. Warranty cost analysis for second-hand products[J]. Mathematical and Computer Modelling, 2000, 31(10): 81-88.[20] Pongpech J, Murthy D N P, Boondiskulchock R. Maintenance strategies for used equipment under lease[J]. Journal of Quality in Maintenance Engineering, 2006, 12(1): 52-67.[21] Shafiee M, Chukova S, Yun W Y, et al. On the investment in a reliability improvement program for warranted second-hand items[J]. IIE Transactions, 2011, 43(7): 525-534.[22] Shafiee M, Finkelstein M, Chukova S. On optimal upgrade level for used products under given cost structures[J]. Reliability Engineering & System Safety, 2011, 96(2): 286-291.[23] Coria V H, Maximov S, Rivas-Dávalos F, et al. Analytical method for optimization of maintenance policy based on available system failure data[J]. Reliability Engineering & System Safety, 2015, 135: 55-63.[24] Melchor-Hernández C L, Rivas-Dávalos F, Maximov S, et al. A model for optimizing maintenance policy for power equipment[J]. International Journal of Electrical Power & Energy Systems, 2015, 68: 304-312.[25] Marshall S E, Chukova S. On analysing warranty data from repairable items[J]. Quality and Reliability Engineering International, 2010, 26(1): 43-52. |